Title and statement of responsibility area
Title proper
Abitibi Canyon
General material designation
Parallel title
Other title information
Title statements of responsibility
Title notes
Level of description
Discrete Item
Repository
Edition area
Edition statement
Edition statement of responsibility
Class of material specific details area
Statement of scale (cartographic)
Statement of projection (cartographic)
Statement of coordinates (cartographic)
Statement of scale (architectural)
Issuing jurisdiction and denomination (philatelic)
Dates of creation area
Date(s)
-
[1933] (Creation)
- Creator
- Dominion Construction Company
Physical description area
Physical description
1 film reel (31 min.): 16mm, b&w
Publisher's series area
Title proper of publisher's series
Parallel titles of publisher's series
Other title information of publisher's series
Statement of responsibility relating to publisher's series
Numbering within publisher's series
Note on publisher's series
Archival description area
Name of creator
Administrative history
No information is available about this creator.
Custodial history
Scope and content
This film relates the process of constructing the dam at Abitibi Canyon. The viewer is shown scenic shots of the Abitibi River, waterfalls and portages through unspoiled forest while a voice-over praises the grandeur of Canadian natural resources which have only recently begun to be put to good use. A map of northern Ontario shows the exact location of the Abitibi River and proposed dam. The viewer is then shown images of the early stages of construction: a construction town; the river whose power is to be harnessed; and, land surveyors examining the terrain. The project's progress is illustrated by animation, live action shots and the narrator. The viewer is shown workers drilling rock, the installation of railway tracks and equipment, the river being diverted, blasting and rock removal. The narrator expresses admiration for the scale of the task and its careful organization. The rock is taken to a crusher where it is prepared for concrete; enormous piles of sand are needed for the same purpose. The concrete is shown being mixed, transported and finally dumped into place. At noon, the workers are shown marching to lunch, and then dining. The narrator describes the care that has been taken to look out for the welfare of the workers by providing good food, a hospital, recreation, and a school for their children. After lunch, the work resumes on the spillway and training wall. A group of engineers discuss the progress. Finally, the dam is completed and the viewer is shown the first trickle of water going down the spillway, as the engineers and executives look on. Soon, the water is shown surging through, and the transformed landscape is shown by aerial photography. Lord Bessborough, the Governor General, and Lady Bessborough visit the dam and tour the spillway and power generators. As the narrator describes the significance of the new source of power, his comments are illustrated by shots of mills, mines, factories, and kitchens. The viewer is shown permanent houses which have replaced the construction town, and a monument to 'Sons of Martha,' workers who 'sacrificed their lives to the project.' The film ends with shots of the still river illuminated by the moon.
Notes area
Physical condition
Immediate source of acquisition
Donated by George Richardson
Arrangement
Language of material
- English
Script of material
Location of originals
MI 097
Availability of other formats
Restrictions on access
Open.
Terms governing use, reproduction, and publication
Copyright provisions may apply. Please consult with an archivist.
Finding aids
Associated materials
Accruals
No further accruals are expected